← All topics
Topic

Civil Engineering

Margin of Safety: Building for the Estimate Being Wrong

July 24, 2026·9 min read

A bridge expecting ten tonnes is built to hold fifty. The extra capacity will likely never be used — and it is not there for unusual lorries. It is there because the calculations might be wrong.